jump to navigation

Abcourt reports update on Elder April 20, 2012

Posted by Fortbridge in Mining.
Tags: , ,
trackback

Abcourt Mines Inc. (TSX-V: ABI) hasĀ  reported on the progress made at the Elder mine.

Mine dewatering

In January last, we expected to have the Elder mine completely dewatered at the end of March.

However, we had some unexpected interruptions caused by obstructions in the shaft (a pipe and a piece of lumber), and two weeks ago, the bearings in our two stationary pumps busted at the same time. They are repaired now and everything is back to normal.

Click here to view the full announcement

About these ads

Comments»

No comments yet — be the first.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 321 other followers