jump to navigation

Blackthorn Resources receives 3rd drill rig to Mumbwa JV Project from BHP Billiton June 29, 2010

Posted by Fortbridge in Mining.
Tags: , , , ,
trackback

Blackthorn Resources (ASX: BTR) announces that a 3rd drilling rig has arrived on site at the Mumbwa JV Project in Zambia to supplement the current Phase 4 drilling program.

The Phase 4 drilling program plans to drill 12 targets situated along the north-south trending “Mushingashi-Mutoya” anomaly which has a 19 km strike length. The JV partners are exploring for an Iron-Oxide-Copper-Gold (IOCG) style of mineralisation similar to existing deposits at Olympic Dam, Ernest Henry and Prominent Hill in Australia.

Click here to view the full announcement.

Advertisement

Comments»

No comments yet — be the first.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 239 other followers