jump to navigation

Eleckra Mines’ assays enhance high grade gold discovery at Central Bore May 25, 2010

Posted by Fortbridge in Mining.
Tags: , , ,
trackback

Eleckra Mines Limited (ASX: EKM) has announced continued high grade results from Central Bore which support the first batch of assays from its current RC drilling program at its 100% – owned Yamarna Gold Project. The Yamarna Project is located approximately 150km east of Laverton on the eastern edge of the Yilgarn Craton and within the Yamarna Greenstone Belt.

In the current phase of RC drilling at Central Bore, Eleckra has completed eighteen holes for 3,594 metres. Assay results from the second lot of nine RC holes have been received returning exciting elevated gold values of up to 40g/t Au over a one metre interval.

Significant results include:

  • 1 metre at 40.27 g/t Au from 188 metres
  • 1 metres at 27.93 g/t Au from 125 metres
  • 2 metres at 14.01 g/t Au from 178 metres including 1 metre at 17.84 g/t Au
  • 3 metres at 6.14 g/t Au from 224 metres

The Central Bore prospect is located only 3.7 kilometres east of the Attila gold deposit at the southern end of the Yamarna gold deposit(s), which have combined Measured, Indicated and Inferred Mineral Resources of 19.8Mt at 1.44 g/t Au for 917,000 ounces of contained gold using a 0.5 g/t cut-off.

Click here to view the full announcement.

For further information, please contact:

Ian Murray
Executive Chairman
Telephone: +61 (0) 438 384 735
www.eleckramines.com.au

Advertisement

Comments»

No comments yet — be the first.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 239 other followers