jump to navigation

Konongo JORC resource upgraded to over 1.2 million ounces of contained gold February 16, 2010

Posted by Fortbridge in Mining.
Tags: , , ,
trackback

Signature Metals (ASX: SBL) has announced that the JORC resource contained within the company’s Konongo Gold Project (Ashanti Gold Belt, Ghana) has been upgraded to over 1.2 million ounces of gold.

Total resource for the project now stands at 17.9 million tonnes at a grade of 2.10g/t gold for 1.21 million ounces of contained gold.

Significantly, resources in the Indicated category have increased by 77% to almost 525,000 ounces.

Further information on the Konongo Gold Project resource and its breakdown is included in the attached press release.

Contact:

Bill Oliver, Managing Director

Tel: +61 8 9481 0101

Media:

Fortbridge +612 9331 0655

Luke Dean 0414 535 433

Comments»

No comments yet — be the first.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 266 other followers